Eco-Park Survey
Eco-Park Survey
Accra, Ghana
Commission Client
Development Team
Geographic Location
Accra, Ghana
Completion Year
2026
Typology & Sector
Surveying
Financial Budget
Custom
Survey-ledpreconstructionplanningsupportforlandandsiteverification.
Technical Highlights
- Geodetic Accuracy: Sub-centimeter boundary verification using multi-frequency RTK GNSS satellite base-and-rover units.
- 3D Terrain Modeling: High-density drone photogrammetry producing an engineering-grade digital elevation model (DEM).
- Site Feasibility: Geotechnical soil testing and slope stability calculation preventing construction erosion risks.
Design Realization & Execution
Eco-Park Survey
Eco-Park Survey
Eco-Park Survey
Survey Equipment & Spatial Deliverables
The technical geodetic instrumentation and digital mapping methodologies deployed for Eco-Park Survey.
Dual-Frequency RTK GNSS Systems
Centimeter-grade satellite tracking utilizing multi-constellation base & rover receivers
High-Resolution Drone Photogrammetry
Dense point cloud generation and orthomosaic terrain models captured via calibrated drone sensors

Geotechnical Slope Stability Analysis
Soil strata identification and slope shear strength assessment for safe foundation design

Engineering 3D Digital Elevation Model
GIS-compatible CAD vector contours, boundary certificates, and civil cut-and-fill calculations
Inspired by Eco-Park Survey?
Every site presents unique opportunities for light, terrain, and architectural expression. Let’s explore your project parameters.
Nirvana Suites
An ongoing hospitality-focused development with active construction coordination.
